Project Name

Airport Hangar Replacement
  • The proposed hangar project will design, construct, install necessary utilities, and equip a 14,000 gross square foot (GSF) building with the capacity to house two planes and will provide interior office spaces for pilots.


Status

  • The Design Build Contractor has been selected. The Design Build Contract has been awarded and the design is under review for issuance of a building permit. Project is in construction.


Project Information

Project Title Airport Hangar Replacement
Building Number 0219
Project Manager Todd Shelton
University Design & Construction
540 231-6449
Architect/Engineer Lindsey Architecture
Greensboro, NC
General Contractor Landmark Builders
Winston-Salem, NC
Gross Square Footage 14,000
No. of Stories (Bldg. Ht.) #
Project Budget $2,520,000
LEED Certification Level N/A
Project Completion Spring 2016


Conceptual Drawings

Click on photo to enlarge.


Project Photos

Click on photo to enlarge.


Contractor Schedule


Stormwater

  • [Future Link]



Project information and photos provided by Planning, Design and Construction.