Campus Heat Plant

From University Design and Construction Wiki
Jump to: navigation, search

Contents

Project Name

Campus Heat Plant (Steam Distribution Upgrades)
  • Project includes repairs and extension of campus steam distribution in various areas including Newman Library, Washington St., Eggleston Hall, Dietrick field,Life Sciences area and Perry Street. Work also includes upgrades to campus steam plant and boilers, 8, 9, 10 to increase energy efficiency. The overall project is split into 10 work/bid packages.

Status

  • Construction started 2007. Construction is substantially complete. Erosion and Sediment permit will remain open until May 2013 when the disturbed areas are anticipated to be restored.

Project Information

Project Title Campus Heat Plant Upgrades
Building Number N/A
Project Manager Pat Hilt
University Design & Construction
540 231-6449
Architect/Engineer Affiliated Engineers
General Contractor Various
Gross Square Footage N/A
No. of Stories (Bldg. Ht.) N/A
Project Budget $28,750,000 (for all bid packages)
LEED Certification Level N/A
Project Completion 2012


Conceptual Drawings

  • None


Project Photos

Click on photo to enlarge.


Contractor Schedule

Stormwater



Project information and photos provided by Planning, Design and Construction.

Contact Patrick Donohoe for photo use permissions.